Projects

Saint Francis Hospital South

Location

Tulsa, OK

Architect

HOK Architects

General Contractor

Crossland Construction

Industry

Healthcare


The Saint Francis Hospital South Campus in Tulsa, Oklahoma was originally built in 2008, and in 2026, they expanded the south campus with the hospital’s first major renovation project. This $250 million project added over 200,000 sq/ft of space to the hospital with a new bed tower supporting an additional 120 patient beds. The project consolidated the anesthesia units, added 8 OR’s, expanded physical rehabilitation services, and included a linear corridor connecting the new patient bed tower to the rest of the existing hospital and parking garage.


Our team worked on the construction of the new patient tower installing both glass and metal cladding systems. The main exterior walls of the new hospital tower feature both stick built and unitized glass curtain wall systems fabricated and installed by our team along with several elevations featuring custom integrated sunshade fins. 5,000 sq/ft of Kawneer’s 1620UT SSG curtain wall system was installed with narrow sightlines and exceptional thermal performance. 35,000 sq/ft of our own unitized glass curtain wall system was also fabricated and installed on the exterior façade with painted silver framing to match. Our own unitized curtain wall system was also used on the canopy covering the hospital’s new main entry. This unitized awning assembly with laminated glass is just as impressive as it’s façade counterpart, but includes a gorgeous vertical striped frit pattern to really make this canopy stand on it’s own. The interior of the hospital feature several metal and glass systems by our team including glass doors, radiator heat covers, interior storefront glass, misc. glass windows and partitions, and other decorative glazing.

McGrath didn’t just show us what the next steps were, they took them with us. The project came out better than we imagined because they were involved.

Steve Berg Principal, BWBR Architects