

Florida Polytechnic University holds the Topping Off Ceremony at the first building of the Florida Polytechnic University Campus in Lakeland, Florida. The new 160,000-square-foot innovation, science and technology building is scheduled to be complete June 2014.
Chuck Jablon, VP of Operations – Skanska | Santiago Calatrava- Architect | Mike P McGrath, President- MG McGrath attend the “Topping Off Ceremony” at the building of the future.
MG McGrath’s Scope of Work:
- Furnish and install the steel stanchions (picture below shows MG McGrath topping off and setting the last stanchion)
- Furnish and install the Operable louver Arm and hydraulics and control system
- Furnish and install the Aluminum Pergola
- Furnish and install the aluminum plate fascia and copula abutment panel systems. (1/8″ aluminum plate panels will be painted white)
All systems are custom and designed and engineered by MG McGrath.
Video: Florida Polytechnic University Marks Construction Landmark